Automation, Digitalization, and AI in Pharmaceutical Technical Development

The pharmaceutical industry is increasingly focused on the concept of acceleration. Adaptive clinical trial designs and an expanding set of expedited regulatory pathways have been introduced to shorten development and review timelines for certain classes of therapies. These mechanisms create the possibility for individual programs to pass more swiftly through parts of the pipeline than was previously feasible. While this has not resulted in a general contraction of development timelines across the industry, it has altered the structure of the process itself.1,2

At the same time, the nature of what is being developed is undergoing fundamental changes. Over the past two decades, the industry has shifted away from a primary reliance on traditional small molecules toward a more diverse set of therapeutic approaches, including biologics, cell and gene therapies, RNA-based medicines, and microbiome-directed interventions. Emerging strategies such as targeted protein degradation and CRISPR-based gene editing further expand this landscape, while computational methods are increasingly integral to how therapies are conceived and optimized.3

These shifts create new opportunities, but they also reshape the development process. As platforms become more complex and programs more tightly linked to specific biological mechanisms and patient subgroups, technical development can no longer be treated as a downstream activity. Analytical, process, and formulation functions increasingly determine whether a candidate can be translated into a stable, scalable, and regulatorily acceptable medicine at all – making technical development not just a support for innovation, but one of its central constraints.

The key pillars of pharma technical development

Pharmaceutical technical development can be understood in terms of three core domains: analytical development, process development, and formulation development.

Domain Focus Key activities
Analytical Measure & characterize Identity, purity, potency, stability, involving chromatography, MS, spectroscopy, dissolution, bioassays
Process Manufacture Route selection, optimization, scale-up, involving cell line and upstream/downstream processing
Formulation Delivery Dosage form, excipients, solubility, stability, delivery systems

 

Historically, these activities have relied heavily on manual, labor-intensive, and largely empirical workflows. Optimization has often proceeded through sequential trial-and-error experiments, with quality assessed primarily through end-product testing rather than real-time control. While this approach has enabled decades of successful development, it is slow, resource-intensive, and vulnerable to late-stage failure – and it becomes increasingly limiting as timelines tighten and therapeutic platforms grow more complex.4

Automation, digitalization, and AI as enablers

Automation, digitalization, and AI/ML provide practical ways to reduce some of the structural bottlenecks in pharmaceutical development. In discovery and early development, AI-based virtual screening can evaluate large chemical spaces and predict interactions between candidate molecules and biological targets. For example, platforms such as AtomNet use machine-learning models to prioritize compounds more efficiently than traditional screening alone.5

Production line pharmaceutical industry. Manufacturing of drugs and medications, pharmaceuticals. Technician, scientist works in a scientific laboratory
Image Credit: Buonnaventura/Shutterstock.com

Generative approaches extend this further by proposing novel molecular structures and iteratively optimizing them for properties such as potency and predicted pharmacokinetics. A case study from Insilico Medicine illustrates how these methods can accelerate early discovery: using an artificial intelligence platform, the company advanced a candidate for idiopathic pulmonary fibrosis from target identification to a preclinical-ready molecule in approximately 18 months.6

Within technical development, automation supports higher-throughput experimentation and more consistent execution. Robotic systems can prepare samples, run assays, and acquire data at scales that are difficult to achieve manually. Digitalization integrates these data into accessible, structured formats that support trend analysis and knowledge reuse. Advanced analytics can then be applied to identify patterns, anticipate potential failure modes, and guide process and formulation optimization, helping teams transition from sequential trial-and-error development to more informed and parallelized approaches.7

These themes are at the heart of the symposium Transforming New Modality Drug Development through Automation, Digitalization, and AI/ML in Pittcon’s Pharmaceutical & Biologics track. Dr. Tao Chen of Genentech will discuss how high-throughput robotics and advanced analytics are reshaping the development of nucleic acid therapeutics and their delivery platforms, sharing practical insights into the challenges and opportunities of end-to-end digitalization and AI integration.

Implications for vaccines and emerging diseases

Vaccine development exemplifies both the urgency and the difficulty of accelerating timelines. Global demand for vaccines is increasing due to antimicrobial resistance, demographic shifts toward older populations, and persistent unmet needs such as malaria and HIV. Nonetheless, vaccine development has continued to be long and expensive, with high manufacturing uncertainty and a low probability of market entry for any given candidate. Technical challenges include scaling complex manufacturing processes and ensuring consistent quality and safety. Clinical trials may be limited in their ability to detect rare adverse events, and regulatory requirements are stringent for good reasons. Together, these factors result in lengthy development cycles and high employee attrition.8

Automation and digitalization can help here as well, particularly in analytical development and stability testing. This is the focus of the symposium Comprehensive Automated Solutions for Drug and Biomarker Analysis, where Dr. Weiyue Xin of Merck will describe fully automated workflows for forced degradation, high-throughput ELISA, and digital data integration, demonstrating how reproducible, scalable platforms can shorten timelines while supporting regulatory confidence.

Conclusion: Pittcon and the future of pharma technical development

Pharmaceutical technical development now sits at the boundary between increasing scientific complexity and the practical limits of time, cost, and reliability. As therapeutic platforms diversify and programs become more specific, manual and sequential approaches are no longer sufficient. Automation, digitalization, and AI/ML do not remove complexity, but they offer ways to manage it by increasing throughput, reducing variability, integrating data, and supporting more informed decisions.

Pittcon supports this transition by convening scientists and technologists who are shaping modern development workflows, providing a forum where methods, tools, and experiences can be exchanged and applied. Exhibitors such as LabWare, Inc. (Booth 1640) further demonstrate how laboratory informatics underpins the data integration required for automated and digital environments.

For those engaged in these changes, Pittcon offers both a view of what is emerging and a place to help shape it. Further information is available at Pittcon.org.

References and further reading

  1. IQVIA. (2025). Global Trends in R&D 2025. (online) Available at: https://www.iqvia.com/insights/the-iqvia-institute/reports-and-publications/reports/global-trends-in-r-and-d-2025.
  2. Laurent, A. (2025). The Drug Development Timeline: Why It Takes Over 10 Years. (online) IntuitionLabs. Available at: https://intuitionlabs.ai/articles/drug-development-timeline-explained.
  3. Choi, Y., Vinks, A.A. and van (2023). Novel Therapeutic Modalities: The Future is Now. Clinical Pharmacology & Therapeutics, 114(3), pp.493–496. DOI: 10.1002/cpt.2996. https://ascpt.onlinelibrary.wiley.com/doi/10.1002/cpt.2996.
  4. Duarte, J.G., et al. (2025). Rethinking Pharmaceutical Industry with Quality by Design: Application in Research, Development, Manufacturing, and Quality Assurance. The AAPS Journal, 27(4). DOI: 10.1208/s12248-025-01079-w. https://link.springer.com/article/10.1208/s12248-025-01079-w.
  5. Wallach, I., Dzamba, M. and Heifets, A. (2015). AtomNet: A Deep Convolutional Neural Network for Bioactivity Prediction in Structure-based Drug Discovery. arXiv (Cornell University). DOI:10.48550/arxiv.1510.02855. https://arxiv.org/abs/1510.02855.
  6. Insilico. A breakthrough milestone in AI-powered drug discovery reached linking biology and chemistry with AI. (online) Available at: https://insilico.com/blog/pcc. 
  7. Manoj Kumar T, et al. (2024). Future of Pharmaceutical Industry: Role of Artificial Intelligence, Automation, and Robotics. Journal of pharmacology and pharmacotherapeutics, 15(2). DOI: 10.1177/0976500x241252295. https://journals.sagepub.com/doi/10.1177/0976500X241252295.
  8. Masignani, V., et al. (2025). De-risking vaccine development: lessons, challenges, and prospects. npj Vaccines, 10(1). DOI: 10.1038/s41541-025-01211-z. https://www.nature.com/articles/s41541-025-01211-z.

About Pittcon

Pittcon is North America’s largest conference and exposition in laboratory science, attracting thousands of industry, academia, and government attendees and exhibitors from around the world in. Pittcon goes beyond the typical conference; it's a global community dedicated to advancing science through education, collaboration, and philanthropy. By bringing together scientists, researchers, educators, students, and industry leaders, Pittcon creates opportunities to learn, connect, and inspire innovation. Beyond the event itself, more than 90% of Pittcon's net proceeds support science education and outreach initiatives locally and globally, funding scholarships, grants, STEM programs, laboratory improvements, and other efforts that strengthen communities and expand access to science.

Pittcon delivers world-class educational and professional development opportunities through its Technical Program, Short Courses, and Networking Workshops and Roundtables. Attendees can explore the latest scientific research through symposia, oral and poster presentations, enhance their skills with expert-led deep-dive courses, and connect with peers through interactive workshops and networking experiences designed to foster collaboration and career growth.

The Pittcon Expo brings the scientific community together in an immersive environment where attendees can discover the latest laboratory technologies, meet with leading instrument and service providers, and experience science in action. Beyond the exhibit booths, the Expo Floor features engaging attractions, educational experiences, demonstrations, and networking spaces, while receptions, parties, and social events create opportunities to build lasting connections with colleagues from around the world.


Sponsored Content Policy: News-Medical.net publishes articles and related content that may be derived from sources where we have existing commercial relationships, provided such content adds value to the core editorial ethos of News-Medical.net, which is to educate and inform site visitors interested in medical research, science, medical devices and treatments.

Last updated: Jul 1, 2026 at 4:06 AM

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Pittcon. (2026, July 01). Automation, Digitalization, and AI in Pharmaceutical Technical Development. News-Medical. Retrieved on October 25, 2026 from https://www.news-medical.net/whitepaper/20260205/Re-engineering-the-Critical-Path-Automation-Digitalization-and-AI-in-Pharmaceutical-Technical-Development.aspx.

  • MLA

    Pittcon. "Automation, Digitalization, and AI in Pharmaceutical Technical Development". News-Medical. 25 October 2026. <https://www.news-medical.net/whitepaper/20260205/Re-engineering-the-Critical-Path-Automation-Digitalization-and-AI-in-Pharmaceutical-Technical-Development.aspx>.

  • Chicago

    Pittcon. "Automation, Digitalization, and AI in Pharmaceutical Technical Development". News-Medical. https://www.news-medical.net/whitepaper/20260205/Re-engineering-the-Critical-Path-Automation-Digitalization-and-AI-in-Pharmaceutical-Technical-Development.aspx. (accessed October 25, 2026).

  • Harvard

    Pittcon. 2026. Automation, Digitalization, and AI in Pharmaceutical Technical Development. News-Medical, viewed 25 October 2026, https://www.news-medical.net/whitepaper/20260205/Re-engineering-the-Critical-Path-Automation-Digitalization-and-AI-in-Pharmaceutical-Technical-Development.aspx.

Other White Papers by this Supplier

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.